Mohawks-Park

history

Since 1999 the Heimfeld the Nagoldtalsperre Mohawk in the former army barracks on the iceberg. Built in own contribution will open the field in mid-April.

As part of a construction project to transform the barracks area of ​​the outfield fence is renewed.

With a major renovation measure 2012 (Removal of the asphalt in the right outfield) the Mohawks park reached its present construction stage.

Approach

Ground Rules,en (Download)